Client
Abu Dhabi Airports Company
Location
Central Utility Plant 2, Zayed Intl. Airport
Date
2025
Full D&B for civil, architectural and MEP modification and refurbishment works for the new ANS facilities, comprising of new electrical room, 2 x UPS Rooms, ATC Approach Control Room, Approach Simulator Training Facility, CNS Equipment Room (Data Center), CNS Monitoring Room, Briefing Room, Meeting Room, Sleeping Rooms, Offices, Male & Female Prayer Rooms
Mechanical Works
- Selective demolition of existing walls and excavation for and casting of new cable trenches
- Cast-in situ ramps, steps, upstands, foundations and plinths
- Internal partitions, raised flooring, internal windows and ceilings (60x60 suspended & gypsum), ceramic flooring, carpet tiles, prayer room carpets, epoxy flooring
- Internal and external FR and NFR wooden and metal doors
- Acoustic partitioning, with acoustic paneling
- Supply and installation of all FF&E
- Construction of a new external car park, with associated interlock, footpath, speed bumps, line marking, fencing and razor wire
Mechanical Works
- Supply and installation of air displacement systems comprising of 10 x 10T, 15T & 20T DX CRAC units with external condensers, return air ductwork, sound attenuation, low velocity air displacement valves
- Modification of CHW network, fresh air and secondary supply air ductwork, relocation of FCUs
- Modification of existing Fire & Life Safety Systems to accommodate the new layout (FF and FHR)
- Installation of new Clean Agent Suppression (HFC-227ea) to the ATC Approach Control, Approach Simulator, CNS Equipment Room & Electrical Room
Electrical Works
- New LV switchgear with new cable management and cable infrastructure distribution via 2 x new 80kVA UPS with 60- minute autonomy, to final DBs to provide dual redundant power supplies to all critical locations
- New lighting and lighting control
- Modification of existing Fire & Life Safety Systems to accommodate the new layout (FAS, PAVA, EML)
- Installation of new VESDA Aspiration Systems to the ATC Approach Control, Approach Simulator, CNS Equipment Room & Electrical Room
ELV Works
- Installation and modifications to existing VSS, SACS, IT/Comms, BMS ELV systems