New GMP Clean Room Facility ADSCC

Client

Abu Dhabi Stem Cell Centre

Location

ADSCC, Abu Dhabi

Date

2022

Design, supply, installation, testing and commissioning of new environmental control system to the GMP Clean Room

HVAC & Environmental Control

Fresh Air AHU, HEPA filters, air valves, heater batteries; monitoring of temperature, humidity, room pressure monitoring, air changes, particle count, oxygen; BMS/DDC integration.

Electrical & Power

Main and sub-distribution boards, generator synchronization, auto changeover panel, UPS systems, lighting, cabling, isolators.

ELV & Safety Systems

Door interlocks, IT/Data, CCTV, fire detection, alarms, emergency lighting.

UPS Room & Emergency Exit

Electrical containment, lighting, air conditioning, BMS/DDC integration, fire and life safety systems.