Design and build refurbishment of Hangar 36.
Civil Works
- Supply and installation of new automated hangar door for aircraft access
- Renovation of existing toilet facilities
- Replacement of purlins, roof and wall panels
- Repair and painting of all steel structures
- Epoxy painting of hangar floor
- External painting of sandwich panel with fire retardant paint
Civil Works
- Replacement of existing HVAC ductwork within the
Electrical Works
- New electrical switchgear and infrastructure for the FLS systems
- Replacement of all Hangar lights and associated wiring
Fire & Life Safety Works
- Installation of a new Fire Fighting System complete with automatic sprinkler system, smoke ventilation systems, automatic foam system, including all related piping and connections.
- Installation of new Fire Alarms System, PAVA and Emergency Lighting Systems
- Testing and commissioning of the complete FLS installation integration